5秒后页面跳转
600-090bandstraps PDF预览

600-090bandstraps

更新时间: 2024-12-01 01:23:39
品牌 Logo 应用领域
GLENAIR /
页数 文件大小 规格书
1页 330K
描述
HiPer-D Accessories

600-090bandstraps 数据手册

  
SERIES 28  
HiPer-D Accessories  
Band-MasterATS tool and bands for termination of cable braid  
600-058 tool, 600-052 and 600-090 band straps  
BAND ASTER™ ATS TOOL AND BANDS  
Band-  
Master™ ATS 300 series SST/passivate I.A.W. AMS 2700. The Band-Master™ ATS  
1
with just one band size. Approved for aerospace and defense, these straps have  
successfully passed rigorous shock, vibration and environmental testing.  
Band installationTool. Use with .240" (6.10 mm)  
wide bands. 6.75 inches (172 mm) length, 1.2  
pounds (0.6 Kg.)  
Standard Band, .240" (6.10 mm) wide. Available  
1
2
Figure  
Description  
Band installation Tool  
Part Number  
Pre-Coiled  
Length  
in.  
Part Number  
Flat  
Accommodates Diameter  
in. mm  
Figure  
mm  
Contact Glenair or visit our website (glenair.com) to view our complete line of Band-Master™ ATS products,  
including pneumatic tools for high volume production and calibration kits.  
2
LENGTH ± .060 (1.5)  
.240 (6.10)  
.350 (8.9)  
TAIL LENGTH  
INDICATOR MARK  
Adapter  
Retention Lip  
Conductors  
BAND ASTER™ SHIELD TERMINATION INSTRUCTIONS  
.400 (1.2mm) Min.  
Length Braid Over  
Termination Area  
Braid  
1. Prepare Cable Braid for termination process  
(Figure 1).  
Shield Termination  
Clamping Process (Figures 4 thru 8)  
2. Push Braid forward over Adapter Retention Lip  
to the Adapter Incline Point (or .4" [10.2mm]  
minimum braid length). Milk Braid as required  
Adapter  
Incline  
NOTE: To free Tool Handles, move Holding Clips  
to center of Tool.  
2
1
4. Squeeze Gripper Release Lever and insert  
Band into the front end opening of theTool.  
(NOTE:Circularportionofloopedbandmust  
always face downward.)  
5. Aligning the Band and Tool with the Shield  
Termination Area, squeeze Black Pull-Up  
Handle repeatedly using short strokes until  
itlocksagainstToolBody. (Thisindicatesthe  
BandiscompressedtotheToolPrecalibrated  
Tension.)  
shield termination area (Figure 2).  
3. Prepare the Band in the following manner:  
IMPORTANT:DuetoConnector/Adaptercircum-  
ference,itmaybenecessarytopreparetheBand  
around the Cable or Retention Area.  
A. Roll Band through the Buckle Slot twice.  
(Bands must be double-coiled.)  
Tail Length  
Indicator Mark  
Buckle  
3
5
7
4
6
8
E
B. Pull on Band until Mark (  
) is within ap-  
proximately .250 inch (6.4mm) of Buckle  
Slot (Figure 3). The Band may be tightened  
further if desired.  
NOTE: If alignment of band and shield is un-  
satisfactory, tensiononbandcanberelaxed  
by pushing on slotted release lever on top  
of tool. Make adjustments as necessary and  
again squeeze black pull-up handle.  
NOTE: Prepared Band should have (  
visible approximately where shown in Figure 3.  
) Mark  
6. Complete the Clamping Process by squeez-  
7. Remove excess band from tool and dispose.  
8. Inspect Shield Termination.  

与600-090bandstraps相关器件

型号 品牌 获取价格 描述 数据表
6000DG AAVID

获取价格

Channel style heat sink with folded back fins
6000E OHMITE

获取价格

Mounting Hardware
6000K_CR07C-P1C54-EC000 PARALIGHT

获取价格

Uniform high quality illumination
6000-L01 EMCORE

获取价格

Single or Dual Optical Outputs
6000-OS3-1110 EMCORE

获取价格

Optical A/B Switch
6000-OS3-1112 EMCORE

获取价格

Optical A/B Switch
6000-OS3-1120 EMCORE

获取价格

Optical A/B Switch
6000-OS3-1122 EMCORE

获取价格

Optical A/B Switch
6000-OS3-1130 EMCORE

获取价格

Optical A/B Switch
6000-OS3-1132 EMCORE

获取价格

Optical A/B Switch