4.3.3 Group C inspection (PI). Group C inspection shall be in accordance with MIL-PRF-38534 and as follows:
a. End-point electrical parameters shall be as specified in table II herein.
b. Steady-state life test, method 1005 of MIL-STD-883.
(1) Test condition A, B, C, or D. The test circuit shall be maintained by the manufacturer under document revision level
control and shall be made available to either DLA Land and Maritime -VA or the acquiring activity upon request.
Also, the test circuit shall specify the inputs, outputs, biases, and power dissipation, as applicable, in accordance
with the intent specified in method 1005 of MIL-STD-883.
(2) TA as specified in accordance with table I of method 1005 of MIL-STD-883.
(3) Test duration: 1,000 hours, except as permitted by method 1005 of MIL-STD-883.
4.3.4 Group D inspection (PI). Group D inspection shall be in accordance with MIL-PRF-38534.
4.3.5. Radiation hardness assurance (RHA). RHA qualification is required only for those devices with the RHA designator as
specified herein. See table IIIA and IIIB.
Table IIIA. Radiation Hardness Assurance Methods Table.
RHA
Testing at
1.5X rated total
dose
Worst Case Analysis
Yes Performed
End points
after dose is
achieved
Statistical
Confidence is
applied to data
method Active
Employeddevices
tested
includes
only as
minimum
part of
the
maximum,
and room
hybrid
temperatures
device.
Element Hybrid Includes
Combines
Combines
End-of- Element Hybrid Element Hybrid
Level
Device temperature temperature and total dose and
life
Level device
level
level
device
level
Level
1/
effects
radiation effects displacement
effects
No
Yes
Yes
Yes
No
No
Yes
No
No
Yes
No
1/ Hybrid level testing is performed as a design qualification test and is only repeated if a change is made to the design as
defined by MIL-PRF-38534, Appendix E.
SIZE
STANDARD
5962-10235
A
MICROCIRCUIT DRAWING
DLA LAND AND MARITIME
REVISION LEVEL
A
SHEET
COLUMBUS, OHIO 43218-3990
15
DSCC FORM 2234