5秒后页面跳转
313053-1 PDF预览

313053-1

更新时间: 2022-02-26 12:20:56
品牌 Logo 应用领域
泰科 - TE /
页数 文件大小 规格书
5页 408K
描述
Crimping Die Assembly

313053-1 数据手册

 浏览型号313053-1的Datasheet PDF文件第1页浏览型号313053-1的Datasheet PDF文件第2页浏览型号313053-1的Datasheet PDF文件第4页浏览型号313053-1的Datasheet PDF文件第5页 
408-9167  
3. Holding the connector body and ferrule in place, actuate the tool through a complete cycle.  
NOTE  
Apply sufficient pressure on cable so shoulder on the connector body maintains contact against locator as shown in Figure 3.  
4. Remove the crimped connector from the tool.  
4. MAINTENANCE AND INSPECTION PROCEDURE  
4.1. Daily Maintenance  
TE Connectivity recommends that each operator of the dies be made aware of, and responsible for, the  
following steps of daily maintenance:  
1. Remove dust, moisture, and other contaminants with a clean brush, or a soft, lint-free cloth. Do not  
use objects that could damage the dies.  
2. Make sure the proper die holding screws are in place and secured with the proper retaining rings.  
Check die alignment and tighten die holding screws at least twice daily.  
3. Make certain all surfaces are protected with a THIN coat of any good SAE 20 motor oil. Do not oil  
excessively.  
4. When the dies are not in use, mate and store them in a clean, dry area.  
4.2. Inspection  
Regular inspections should be performed by quality control personnel. A record of scheduled inspections  
should remain with the dies and/or be supplied to supervisory personnel responsible for the dies. Though  
recommendations call for at least one inspection a month, the inspection frequency should be based on the  
amount of use, ambient working conditions, operator training and skill, and established company standards.  
These inspections should be performed in the following sequence:  
Visual Inspection  
1. Remove all lubrication and accumulated film by immersing the dies in a suitable commercial  
degreaser that will not affect paint or plastic material.  
2. Make sure all die holding screws, retaining rings, and die components are in place. Refer to the parts  
listed in Figure 5 if replacements are necessary.  
3. Check all bearing surfaces for wear. Remove and replace worn components.  
4. Inspect the crimp area for flattened, chipped, cracked, worn, or broken areas. If damage is evident,  
the dies must be repaired before returning them to service. See Section 5, REPLACEMENT AND  
Gaging the Crimping Chamber  
This inspection requires the use of a plug gage conforming to the dimensions provided in Figure 4. TE  
does not manufacture or market these gages.Refer to Instruction Sheet 408-7424 for more information on  
plug gages. Proceed as follows:  
1. Mate the dies until it is evident that they have bottomed. Hold the dies in this position with a pressure  
of approximately 69 kPa [10 psi].  
2. Align the GO element with the appropriate crimping area. Push element straight into the crimping area  
without using force. The GO element must pass completely through the crimping area as shown in  
Figure 4.  
3. Now align the NO-GO element and try to insert it straight into the same crimping chamber. The NO-  
GO element may start entry but must not pass completely through as shown in Figure 4.  
4. Repeat Steps 2 and 3 for each crimp section listed in Figure 4.  
If the crimping chamber conforms to the gage inspection, the dies are considered dimensionally correct  
and should be lubricated with a THIN coat of any good SAE 20 motor oil. If not, the dies must be repaired  
before returning them to service. See Section 5, REPLACEMENT AND REPAIR.  
3 of 5  
Rev B  

与313053-1相关器件

型号 品牌 描述 获取价格 数据表
313054-1 TE Crimping Die Assembly

获取价格

313055-1 TE Crimping Die Assembly

获取价格

31306.3 LITTELFUSE 3AG Slo-Blo Fuse 313/315 Series

获取价格

31306.3P LITTELFUSE Axial Lead and Cartridge Fuses - Glass Body

获取价格

313062 LITTELFUSE Axial Lead and Cartridge Fuses

获取价格

313062 INTEL Dual-Core Intel Xeon Processor

获取价格