5秒后页面跳转
MAX22701EVKIT PDF预览

MAX22701EVKIT

更新时间: 2023-12-18 00:00:00
品牌 Logo 应用领域
美信 - MAXIM /
页数 文件大小 规格书
18页 2375K
描述
2 EV Kits to Support 3 Output Options: GNDB, Miller Clamp, or Adjustable UVLO

MAX22701EVKIT 数据手册

 浏览型号MAX22701EVKIT的Datasheet PDF文件第1页浏览型号MAX22701EVKIT的Datasheet PDF文件第2页浏览型号MAX22701EVKIT的Datasheet PDF文件第4页浏览型号MAX22701EVKIT的Datasheet PDF文件第5页浏览型号MAX22701EVKIT的Datasheet PDF文件第6页浏览型号MAX22701EVKIT的Datasheet PDF文件第7页 
MAX22700‒MAX22702  
Evaluation Kits  
Evaluates: MAX22700D‒MAX22702D  
MAX22700E‒MAX22702E  
6) Enable all three power supplies.  
Quick Start  
Note: It is also possible to power the EV kits from a  
single power supply to test electrical parameters, but  
this invalidates the digital isolation between the A side  
and the B side of the IC, and the isolation between U1  
and U2.  
Required Equipment  
MAX22701EVKIT# with MAX22701EASA+ as U1 and  
U2, or MAX22702EVKIT# with MAX22702EASA+ as  
U1 and U2  
● One DC power supply with an output range up to 5.5V  
Two DC power supplies with an output range up to 36V  
Signal/function generator  
7) Connect the signal/function generator output to  
SMA connector INP_IN1. Set the function generator  
output to be a square wave with the amplitude of  
V
, 10kHz frequency, and 50% duty cycle. Enable  
DDA  
Oscilloscope  
the function generator output.  
8) Observe the B-side output voltage on the OUT1 test  
Procedure  
point to be a square wave with the amplitude of V  
,
DDB  
The MAX22701 and MAX22702 EV kits are fully assem-  
bled and ready for evaluation. Follow the steps below to  
verify board functionality:  
10kHz frequency, and 50% duty cycle.  
9) To measure the propagation delay matching between  
U1 and U2, connect the function generator output to  
both SMA connectors INP_IN1 and INP_IN2. Config-  
ure the output to be a square wave with the amplitude  
1) Verify jumper settings. See Table 2 for all shunt posi-  
tions.  
J1 and J2 are closed.  
For the MAX22702 EV kit, J3 and J4 are closed.  
of V  
, 10kHz frequency, and 50% duty cycle. Ob-  
DDA  
serve the propagation delay skew between the OUT1  
2) Connect the JA1 pin 3 (U1 EN) and pin 4 (GNDA1) to-  
gether, and the JA2 pin 3 (U2 EN) and pin 4 (GNDA2)  
together using shunts or jump wires to always enable  
the U1 and U2 devices.  
test point and OUT2 test point.  
Note: When connecting one scope probe between  
the OUT1 and VSSB1 test points and another scope  
probe between the OUT2 and VSSB2 test points,  
VSSB1 and VSSB2 are shorted together through the  
oscilloscope, which invalidates the isolation between  
U1 and U2. Make sure that VSSB1 and VSSB2 are  
safe to be shorted together when probing OUT1 and  
OUT2 using the same oscilloscope.  
3) Connect a DC power supply between the EV kit  
VDDA1 and GNDA1 test points. Set the output  
between 3V and 5.5V.  
4) Connect one DC power supply between the EV kit  
VDDB1 and VSSB1 test points, and another DC pow-  
er supply between VDDB2 and VSSB2 test points.  
5) MAX22701 EV kit: set both DC power supply outputs  
between 13V and 36V.  
MAX22702 EV kit: set both DC power supply outputs  
between 6V and 36V.  
Maxim Integrated  
3  
www.maximintegrated.com  

与MAX22701EVKIT相关器件

型号 品牌 描述 获取价格 数据表
MAX22702D MAXIM Ultra-High CMTI Isolated Gate Drivers

获取价格

MAX22702D ADI 超高CMTI隔离栅极驱动器

获取价格

MAX22702DASA MAXIM Ultra-High CMTI Isolated Gate Drivers

获取价格

MAX22702E MAXIM Ultra-High CMTI Isolated Gate Drivers

获取价格

MAX22702E ADI 超高CMTI隔离栅极驱动器

获取价格

MAX22702EASA MAXIM Ultra-High CMTI Isolated Gate Drivers

获取价格